Provides Earned Value Management support for government aerospace and space programs. Responsibilities include analyzing contractor IPMRs, communicating performance results, supporting or leading Integrated Baseline Reviews, preparing management plans and technical reports, and mentoring program personnel on EVM policies and processes. The role requires extensive EVM and program control experience, familiarity with systems engineering, risk analysis, cost estimating, and large-scale development programs. Work is performed onsite at secure Space Systems Command facilities.
Overview
Tecolote is searching for a Senior Earned Value Management Analyst to provide Earned Value Management (EVM) support to our government customers, to include analysis on monthly Integrated Program Management Report (IPMR) from development contractors.
Responsibilities
Tecolote Research, Inc. is hiring candidates to perform in a wide variety of Earned Value Management positions:
- Work closely with Government Program Office teams and contractors
- Work on-site with the customer at a secure facility at Space Systems Command (SSC)
- Support the management of major Air Force and Space Force programs at SSC
- Perform EVM analysis and communicate results to program managers to inform decision-making
- Plan, Participate, and sometimes lead Integrated Baseline Review (IBR) activities
- Prepare briefings, management plans, and technical reports for the customer
- Instruct/mentor project officers on EVM policies, processes, and procedures
- Salary Range: $95,000.00 - $120,000.00/Year, DOE
Skills Required
- Applicants must possess 8-12 years of Earned Value Management (EVM) and Program Control experience, preferably with the Department of Defense or commercial aerospace programs
- Applicants must demonstrate analytic and presentation skills, be proficient with EVM systems software tools, such as wInsight, and possess extensive knowledge of EVM industry standards and practices
- Applicants should have experience leading and supporting Compliance Analysis, Performance Analysis, Predictability Analysis, Integrated Baseline Reviews, and EVM specific training
- Applicants should have familiarity with systems engineering principles and practices, experience with large-scale development and test programs, risk analysis, and cost estimating
- Prior work at SSC and/or space programs is highly desirable
- Applicants must be a U.S. citizen, due to the national security nature of the position
- Additionally, applicants must be able to obtain and maintain a TS/SCI security clearance, and be willing and able to work in secure facilities (e.g. a SCIF or SAPF)
Education
Bachelor’s degree required, preferably in math, engineering, business, or the sciences.
CompensationThe base pay range for this role is $95,000 – $120,000 per year.
Tecolote Research, Inc. Goleta, California, USA Office
Goleta, CA, United States
Tecolote Research, Inc. El Segundo, California, USA Office
El Segundo, United States
Tecolote Research, Inc. Santa Barbara, California, USA Office
5383 Hollister Avenue, Suite 100, Santa Barbara, United States, 93111
Similar Jobs
Artificial Intelligence • Healthtech • Machine Learning • Natural Language Processing • Biotech • Pharmaceutical
Build and deploy production-grade AI and machine learning systems supporting biomedical research and drug discovery. Own technical solutions from architecture through deployment, including data pipelines, retrieval systems, knowledge systems, inference services, evaluation frameworks, and human-in-the-loop workflows. Partner with scientists and engineers to transform prototypes into scalable, secure, reliable platforms. Lead technical delivery, make architecture tradeoffs, improve engineering standards, mentor teammates, and promote responsible AI practices.
Top Skills:
Agentic AiAi PlatformsAPIsCi/CdCloud ComputingContainersDistributed InferenceDistributed TrainingHigh-Performance ComputingInference OptimizationJaxKnowledge GraphsLarge Language ModelsMachine LearningMlopsModel ServingMultimodal LearningOrchestrationPythonPyTorchRetrieval-Augmented GenerationScientific Machine LearningVersion Control
Artificial Intelligence • Healthtech • Machine Learning • Natural Language Processing • Biotech • Pharmaceutical
Build and deploy production-grade AI and machine learning systems supporting biomedical research, including multimodal models, intelligent agents, retrieval, knowledge systems, evaluation frameworks, and inference services. Own architecture through production, make scalability and reliability tradeoffs, establish responsible AI practices, and drive technical delivery. Collaborate with scientists, computational biologists, and platform teams while mentoring engineers and improving engineering standards, observability, and system performance.
Top Skills:
Agentic AiAi EvaluationAPIsCi/CdCloud ComputingContainersDistributed InferenceDistributed TrainingGpu TrainingHigh-Performance Computing (Hpc)JaxKnowledge GraphsLarge Language Models (Llms)MlopsMultimodal LearningOrchestrationPythonPyTorchRetrieval-Augmented Generation (Rag)Scientific Machine Learning
Artificial Intelligence • Healthtech • Machine Learning • Natural Language Processing • Biotech • Pharmaceutical
Provides medical and scientific oversight for clinical trials, including medical monitoring, safety and data review, protocol development, risk management, regulatory support, and clinical deliverables. Leads interactions with investigators, health authorities, ethics committees, and external monitoring or adjudication committees. Ensures data integrity, TMF compliance, protocol adherence, inspection readiness, and clinical study reporting. May manage and mentor clinical colleagues. Requires a medical degree, prescribing license, and at least four years of biopharmaceutical clinical research experience.
Top Skills:
Clinical Trial Data ReviewIch/GcpInd/Nda Regulatory SubmissionsStatistical Analysis PlansTables Listings And FiguresTrial Master File (Tmf)
What you need to know about the Los Angeles Tech Scene
Los Angeles is a global leader in entertainment, so it’s no surprise that many of the biggest players in streaming, digital media and game development call the city home. But the city boasts plenty of non-entertainment innovation as well, with tech companies spanning verticals like AI, fintech, e-commerce and biotech. With major universities like Caltech, UCLA, USC and the nearby UC Irvine, the city has a steady supply of top-flight tech and engineering talent — not counting the graduates flocking to Los Angeles from across the world to enjoy its beaches, culture and year-round temperate climate.
Key Facts About Los Angeles Tech
- Number of Tech Workers: 375,800; 5.5% of overall workforce (2024 CompTIA survey)
- Major Tech Employers: Snap, Netflix, SpaceX, Disney, Google
- Key Industries: Artificial intelligence, adtech, media, software, game development
- Funding Landscape: $11.6 billion in venture capital funding in 2024 (Pitchbook)
- Notable Investors: Strong Ventures, Fifth Wall, Upfront Ventures, Mucker Capital, Kittyhawk Ventures
- Research Centers and Universities: California Institute of Technology, UCLA, University of Southern California, UC Irvine, Pepperdine, California Institute for Immunology and Immunotherapy, Center for Quantum Science and Engineering

